Determining the difference between a drained and back-ventilated rainscreen and a pressure-equalized rainscreen cannot be done by visual inspection alone; test results are essential. Some Arrowhead metal cladding rainscreen systems meet both AAMA 508 Pressure...
(This article was originally published on www.FLSustainability.com) In Southeast Washington D.C., a site formerly owned by CSX has been developed into a unique urban complex designed by R2L:Architects. The three buildings feature Vitrabond® aluminum composite panels...
(This article was originally published on www.FLSustainability.com) Consolidation of expansive glass and non-glass cladding into a total curtain wall system is embodied at Stella (14 Lecount Place), designed by Beyer Blinder Belle, through the use of the ES-UN8030...
The Leadership in Energy and Environmental Design (LEED) green building rating system was developed by the US Green Building Council (USGBC) in 1998 to provide third-party verification that a building project has reached LEED Certification. There are four levels of...
As we prepare to bid a final farewell to 2020, we are pleased to present our annual Top Projects list. Despite the myriad challenges faced over the past year, we extend our heartfelt gratitude to our esteemed customers and partners for their steadfast support and for...
The Boulevard, the first residential building on Boston’s beloved Greenway (the Rose Fitzgerald Kennedy Greenway Park), is a unique development designed by Finegold Alexander Architects. The recently completed development includes 36 residential units — five of which...