  <?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>LEED - Fairview Architectural North America</title>
	<atom:link href="https://fairview-na.com/tag/leed/feed/" rel="self" type="application/rss+xml" />
	<link>https://fairview-na.com</link>
	<description>Vitrabond G2 - Vitrabond - Arrowhead - Vitraplate - Vitraedge</description>
	<lastBuildDate>Wed, 12 Aug 2026 12:17:41 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://fairview-na.com/wp-content/uploads/2020/02/cropped-FVA_Icon_Corporate-favicon-512x512-1-2-32x32.jpg</url>
	<title>LEED - Fairview Architectural North America</title>
	<link>https://fairview-na.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Continuous Insulation and Metal Panel Code Compliance</title>
		<link>https://fairview-na.com/continuous-insulation-and-metal-panel-code-compliance/</link>
		
		<dc:creator><![CDATA[Fairview Editorial]]></dc:creator>
		<pubDate>Wed, 12 Aug 2026 15:00:00 +0000</pubDate>
				<category><![CDATA[Blogs]]></category>
		<category><![CDATA[Technical Information]]></category>
		<category><![CDATA[continuous insulation]]></category>
		<category><![CDATA[LEED]]></category>
		<category><![CDATA[NFPA 285]]></category>
		<category><![CDATA[rainscreen]]></category>
		<category><![CDATA[specification]]></category>
		<guid isPermaLink="false">https://fairview-na.com/?p=30388</guid>

					<description><![CDATA[<p>Learn how continuous insulation thickness affects metal panel rainscreen attachment geometry and ASHRAE 90.1 compliance before your energy model is locked.</p>
<p>The post <a href="https://fairview-na.com/continuous-insulation-and-metal-panel-code-compliance/">Continuous Insulation and Metal Panel Code Compliance</a> first appeared on <a href="https://fairview-na.com">Fairview Architectural North America</a>.</p>]]></description>
										<content:encoded><![CDATA[<p>You are detailing a rainscreen wall assembly in Design Development and the energy model is two weeks from being locked. The structural engineer has sized the girt spacing, the facade system is selected, and then the mechanical engineer flags that your CI thickness needs to increase by an inch to meet ASHRAE 90.1-2022 opaque wall R-values for Climate Zone 5. That single inch changes your sub-framing geometry, your anchor embedment and potentially your panel module, and none of those changes are free at permit.</p>
<h2>ASHRAE 90.1-2022 Sets the Baseline Your Wall Assembly Must Meet Before Anything Else</h2>
<p>ASHRAE 90.1-2022 Table C402.1.3 prescribes minimum continuous insulation R-values for nonresidential opaque walls organized by climate zone. Requirements tighten meaningfully in Zones 4 through 8 relative to the 2019 edition, and that tightening has direct consequences for how deep your attachment system needs to reach.</p>
<p>The standard distinguishes between mass walls, metal building walls and steel-framed walls. Rainscreen assemblies over metal stud backup typically fall under the steel-framed category, which carries the most demanding CI requirements of the three. That classification is not a detail you can defer; it determines your compliance threshold from the first line of the energy model.</p>
<p>ASHRAE 90.1 Section 5.5.3.1 defines continuous insulation as insulation that is continuous across all structural members without thermal bridges other than fasteners and service openings. A layer interrupted by Z-girts or continuous sub-framing does not qualify under that definition. If your attachment strategy relies on Z-girts running full height, the insulation behind them is not CI for compliance purposes, regardless of what the product data sheet says.</p>
<p>The IECC 2021 and 2024 editions both reference ASHRAE 90.1 as a compliance path, so jurisdictions adopting either code cycle will enforce these same thresholds. Confirming which edition your authority having jurisdiction has adopted is a first-week DD task, not a permit-phase discovery.</p>
<h2>Every Additional Inch of CI Moves Your Attachment Point and Changes the Structural Equation</h2>
<p>Panel attachment systems, whether thermally broken clip-and-rail, standoff bracket or hat channel, must span from the structural backup wall to the panel face. As CI thickness increases, that span increases and the moment arm on each fastener grows. The structural consequence is not linear; bending stress at the anchor point rises with the square of the standoff depth, which is why a one-inch change in CI thickness can require a complete re-evaluation of the clip family.</p>
<p>Thermally broken clips are engineered to specific standoff depths. Specifying a clip rated for three inches of CI on a wall that now requires four and a half inches means either substituting the clip family or adding a secondary sub-frame. Both paths require re-engineering and both consume schedule. AAMA TIR-A8 provides guidance on thermal performance of wall framing components and is a useful reference when evaluating whether a proposed clip substitution maintains the thermal break integrity the energy model depends on.</p>
<p>Increased standoff depth also affects panel joint alignment, sealant pocket geometry and the drainage plane position. All of those conditions must be re-coordinated with the waterproofing membrane and flashing details. A drainage gap correctly sized for a three-inch assembly may be undersized or misaligned at four and a half inches. Wind load transfer through longer standoff brackets introduces higher bending stress at the anchor point into the backup structure; clip manufacturers publish load tables at specific standoff depths, and those tables are a coordination requirement, not optional reference material.</p>
<h2>Nominal R-Value and Effective R-Value Are Not the Same Number and Compliance Is Based on the Effective Value</h2>
<p>ASHRAE 90.1 Appendix A provides the isothermal planes and parallel path calculation methods used to determine effective R-value for wall assemblies. A wall assembly with mineral wool CI interrupted by steel Z-girts at 24 inches on center can lose a significant portion of its nominal R-value through thermal bridging. That gap between nominal and effective is where compliance failures originate.</p>
<p>Thermally broken clip systems reduce but do not eliminate conductive loss. The thermal break material, typically a glass-fiber-reinforced polymer, must have a documented thermal conductivity value to be used in an energy model. A verbal claim that a clip is &#8220;thermally broken&#8221; is not sufficient documentation; you need a published lambda value from the manufacturer, generated under a recognized test protocol.</p>
<p>Energy modelers and building officials increasingly require THERM or equivalent finite element analysis to substantiate effective R-value claims for assemblies with complex bridging geometry. THERM, published by Lawrence Berkeley National Laboratory, is an accepted analysis tool under ASHRAE 90.1 methodology. Providing that documentation at DD rather than at permit review prevents the schedule loss that comes from a compliance review comment requiring additional analysis after drawings are issued for permit.</p>
<p>Request published effective R-value data from your attachment system supplier, not nominal insulation R-value alone, and confirm that the data was generated using ASHRAE 90.1 Appendix A methodology. If the supplier cannot provide that documentation, the number cannot be used in your energy model with confidence.</p>
<h2>Panel System Selection and CI Depth Must Be Resolved Together, Not Sequentially</h2>
<p>Aluminum composite material panels and solid aluminum plate panels have different stiffness-to-weight ratios. At longer unsupported spans created by deeper CI assemblies, panel deflection limits under wind load become a governing factor in module sizing. Selecting a panel system before CI depth is confirmed means you may be sizing modules against a span condition that no longer exists once the energy model is updated.</p>
<p>Vitrabond FR is fabricated with a fire-resistant mineral-filled core and is tested under NFPA 285 as part of a complete wall assembly. The tested assembly configuration specifies insulation type, thickness and position. A change in CI depth may require re-evaluation against the tested assembly parameters, because NFPA 285 compliance is assembly-specific, not product-specific. Confirming that your specified CI type and thickness fall within the tested configuration is a submittal requirement that surfaces much earlier when you resolve it in DD.</p>
<p>Vitraplate, Fairview&#8217;s solid aluminum plate product, offers higher stiffness and can accommodate wider module spacing. That additional stiffness can reduce the number of attachment points required, which simplifies coordination with CI layer penetrations and reduces the cumulative thermal bridging contribution from fasteners.</p>
<p>Finish durability is independent of CI depth but is a parallel specification decision that should be confirmed at the same stage. AAMA 2605 is the appropriate performance standard for exterior architectural aluminum in commercial applications. Coatings qualified under AAMA 2605 using Kynar 500 resin meet the weathering, chalk and fade resistance thresholds that commercial facade service life requires. Confirm AAMA 2605 compliance regardless of how the attachment geometry resolves.</p>
<h2>CI Thickness Is a Multi-Discipline Decision That Cannot Be Resolved in the Facade Specification Alone</h2>
<p>The mechanical engineer owns the energy model inputs. The facade specifier owns the assembly R-value documentation. The structural engineer owns the anchor and sub-framing design. All three must agree on CI thickness before any of them can finalize their drawings. When that agreement is deferred, each discipline produces drawings against a different assumption, and the reconciliation cost at permit is substantially higher than the coordination cost at DD.</p>
<p>A coordination checklist issued at the start of DD should confirm the climate zone and applicable ASHRAE 90.1 edition, the target effective R-value, the insulation product type and density, and the attachment system standoff depth range with thermal break documentation. That list is short, but the absence of any item on it creates downstream exposure for every discipline involved.</p>
<p>Submittals from the facade system supplier should include tested assembly data, effective R-value calculations and clip load tables at the specified standoff depth. Reviewing those documents at DD rather than at submittal review compresses the risk window considerably. When the project is pursuing LEED v4.1 certification, the CI assembly documentation feeds directly into the Energy and Atmosphere Prerequisite calculations, which reference ASHRAE 90.1-2022 as the baseline standard. An under-coordinated DD decision on CI thickness has consequences that extend well past the facade specification.</p>
<h2>These Are the Details That Fail Energy Compliance Review and How to Avoid Them</h2>
<p>Three errors account for the majority of CI-related compliance review failures on rainscreen facade projects.</p>
<ol>
<li>Specifying CI thickness based on nominal R-value without accounting for thermal bridging at clips and sub-framing. The energy model must reflect effective R-value calculated under ASHRAE 90.1 Appendix A methodology. A nominal value that meets the prescriptive threshold may fall short once bridging is factored in.</li>
<li>Using continuous Z-girts as the primary attachment plane. Under ASHRAE 90.1 Section 5.5.3.1, the insulation area covered by continuous Z-girts does not qualify as CI. If Z-girts are required for panel module reasons, the effective R-value calculation must account for the full bridging area they introduce, and the assembly may need additional insulation thickness to compensate.</li>
<li>Failing to confirm that the NFPA 285 tested assembly matches the specified CI type and thickness. Fire performance documentation submitted at permit must cover the actual assembly being built. A tested assembly with one insulation type and thickness does not automatically cover a field assembly with a different product or depth, even if the nominal R-values are similar. Verify the tested configuration against your specified assembly before the drawings are issued.</li>
</ol>
<p>Resolving these three conditions in Design Development, rather than at permit or during construction, is the difference between a compliant submittal and a costly revision cycle.</p>
<p>If you are working through CI thickness decisions on a current project and want to review how Vitrabond FR or Vitraplate performs within your specific assembly configuration, Fairview&#8217;s technical team is available for a detail review or specification consultation. Contact us through fairview-na.com to start that conversation before your energy model is locked.</p><p>The post <a href="https://fairview-na.com/continuous-insulation-and-metal-panel-code-compliance/">Continuous Insulation and Metal Panel Code Compliance</a> first appeared on <a href="https://fairview-na.com">Fairview Architectural North America</a>.</p>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Understanding the LEED Green Building Rating System for Metal Cladding Material</title>
		<link>https://fairview-na.com/leed-green-building-rating-system/</link>
		
		<dc:creator><![CDATA[Victoria Tayler]]></dc:creator>
		<pubDate>Fri, 20 Jan 2023 07:20:06 +0000</pubDate>
				<category><![CDATA[Blogs]]></category>
		<category><![CDATA[Product News]]></category>
		<category><![CDATA[Project Updates]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Technical Information]]></category>
		<category><![CDATA[Vitrabond]]></category>
		<category><![CDATA[Vitraplate]]></category>
		<category><![CDATA[ACM]]></category>
		<category><![CDATA[Aluminum Composite Material]]></category>
		<category><![CDATA[LEED]]></category>
		<category><![CDATA[MCM]]></category>
		<category><![CDATA[Metal Composite Material]]></category>
		<category><![CDATA[Solid Aluminum Plate]]></category>
		<category><![CDATA[SYLPOE]]></category>
		<guid isPermaLink="false">https://fairview-na.com/?p=20788</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_0 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_0">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_0  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_0  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><blockquote></blockquote>
<p>The Leadership in Energy and Environmental Design (LEED) green building rating system was developed by the US Green Building Council (USGBC) in 1998 to provide third-party verification that a building project has reached LEED Certification. There are four levels of certification (Certified, Silver, Gold, and Platinum) that a building project can achieve by being awarded point-based credits within the rating system.</p>
<blockquote></blockquote></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_1">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_1  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_1  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>LEED has evolved and grown over the years. The current version is LEED version 4 which focuses on different building and renovation types. The LEED Building Design and Construction (BD+C) reference guide focuses on eight building types and can be viewed <a href="http://www.usgbc.org/leed/v4" target="_blank" rel="noopener">here</a>.</p>
<p>There are several ways that metal cladding products such as solid 3mm aluminum and aluminum composite materials can be used to earn credits towards the “Building Product Disclosure and Optimization – Sourcing of Raw Materials” LEED rating system category for a building. Here is an example of the credits possible for new constructions:</p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_2">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_2  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_0">
				
				
				
				
				<span class="et_pb_image_wrap "><img fetchpriority="high" decoding="async" width="956" height="446" src="https://fairview-na.com/wp-content/uploads/2023/01/1.jpg" alt="" title="1" srcset="https://fairview-na.com/wp-content/uploads/2023/01/1.jpg 956w, https://fairview-na.com/wp-content/uploads/2023/01/1-480x224.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 956px, 100vw" class="wp-image-20892" /></span>
			</div><div class="et_pb_module et_pb_text et_pb_text_2  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>To find out what credits a product has, ask the manufacturer for their LEED Data Sheet. You will then receive something that looks like this:</p></div>
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_3">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_3  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_image et_pb_image_1">
				
				
				
				
				<span class="et_pb_image_wrap "><img decoding="async" width="879" height="214" src="https://fairview-na.com/wp-content/uploads/2023/01/Ivory-and-Green-Modern-Neutral-Problem-and-Solution-Table-Graph-1.jpg" alt="" title="Ivory and Green Modern Neutral Problem and Solution Table Graph (1)" srcset="https://fairview-na.com/wp-content/uploads/2023/01/Ivory-and-Green-Modern-Neutral-Problem-and-Solution-Table-Graph-1.jpg 879w, https://fairview-na.com/wp-content/uploads/2023/01/Ivory-and-Green-Modern-Neutral-Problem-and-Solution-Table-Graph-1-480x117.jpg 480w" sizes="(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 879px, 100vw" class="wp-image-20893" /></span>
			</div><div class="et_pb_module et_pb_text et_pb_text_3  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p>&nbsp;</p>
<p>The products are services provided by manufacturers like Fairview and do not earn project points themselves. Our role is instead to educate our team and our customers on how our products can contribute to a building’s overall LEED rating. We also become involved in the process when supplying LEED product compliance is required.</p>
<p>An example of this is the SYLPOE – San Ysidro Land of Port of Entry. This project is the first LEED Platinum land port of entry out of more than 20 LEED-registered border crossings in the US. This project features 168,297sf of our 3mm solid aluminum Vitraplate panels. More information on this project <a href="https://fairview-na.com/project/sylpoe-san-ysidro-land-port-of-entry/">here</a>.</p>
<p>You can download our LEED Data Sheet from our <a href="https://www.caddetails.com/main/company/viewlistings?companyID=5444" target="_blank" rel="noopener">Digital Document Binder</a>. Alternatively, for more information on LEED in general and Fairview’s metal cladding products, please contact our team today at <a href="mailto:helpdesk@farview-na.com">helpdesk@farview-na.com</a> or use our <a href="https://fairview-na.com/contact/">online form</a>.</p></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div><p>The post <a href="https://fairview-na.com/leed-green-building-rating-system/">Understanding the LEED Green Building Rating System for Metal Cladding Material</a> first appeared on <a href="https://fairview-na.com">Fairview Architectural North America</a>.</p>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
